Forest Lake ~ Whole Yard Make Over

 ~ 10 Cubic Meters of Caramel Swirl stones ~ 88 Square Meters of Sir Walter DNA Certified Turf with under turf ~ Some new garden edging where it was missing to match existing garden edging ~ Agi Drain down side of house under stones 

~ Cut and removed tree trunks sticking out of ground 

Parkinson ~ Grass out, Stones in!

 ~ Grass removed ~ Weed matting put down ~ Blueberry Crush 20mm stones 

(will be whiter but still wet in photos) ~ Charcoal pavers

Kelvin Grove ~ Grass and Garden Edge

 ~ New sleeper garden beds ~ Under turf ~ 68 Square meters of Nullarbor Couch ~ New Plants and mulch in rear gardens to come next wee

The Gap ~ Back Yard Reno

 ~ Excavation to level the back yard ~ 41 Meters of retaining walls from 200mm to 800mm high ~ 188 Square Meters of Sir Walter DNA Certified Turf ~ 3.5 Cubic Meters of Cypress Chip A 

Runcorn ~ Garden Edging and walls

 Front Yard ~ Old wooden retaining wall removed ~ Adbri Flagstone Impressions in Ironbark used to create 6M long new wall Rear Garden ~ Old wooden garden edging removed ~ Garden cleaned up and trees removed ~ Adbri Flagstone Impressions in Ironbark used to create 23.4 M long garden edge and wall ~ Hard wood chip used to finish off ~ Down pipe that had been cracked by tree roots replaced 

Ormeau Deck

 ~ Old deck taken out including frame work ~ New deck frame installed ~ New treated pine timber deck installed ~ Existing balustrade posts realigned and built into deck ~ Existing balustrade stainless steel wire tightened with new fittings where required ~ Deck Cleaned and 2 coats of Merbau stain applied 

River Stone Crossing ~ Garden Cleanup

 ~ Plants cut back and shaped ~ Gardens Weeded ~ Weeds poisoned ~ 1.75 Cubic Meters of hardwood Chip laid ~ All green waste removed 

Heritage Park ~ Stage 3

 ~ 6.75 Cubic Meters of Cypress Chip A ~ Reuse existing stones from utility side of house ~ Lay paver path way to paver pad over looking the pool using left over pavers on site 

Heritage Park ~ Stage 2

 - Patio Side - ~ Deck removed ~ Concrete under deck removed ~ Site prepped ~ New concrete laid - Utility Side - ~ Stones lift and moved to be used in Stage 3 ~ Site prepped ~ Concrete laid - Still to go........ ~ Stage 3 to be finished this week in time for Christmas, photos to come later in week. ~ Stage 4 - Decorative finish to concrete in early 2019 

~ Stage 5 - Glass pool fencing early 2019